SiteCore BOQ Engine

7 IS-Metric Construction Calculators & Local Project BOQ Engine (`sitecore_v1`)

Role & Context

Creator & Lead Systems Engineer

Verified Static SPA (`/demos/sitecore/`) + Public Overview (`sites.google.com/view/sitecore-ak/`)

Built-In Calculators

7 IS-Metric Tools + ft/in Helper

Core Workflow

Calculate → Explain → Save → Price → Work

Local Persistence

IndexedDB (sitecore_v1) · JSON / CSV Backup

Scope Boundary

Estimation Aid Only (Not Structural / BBS)

SiteCore BOQ Engine
SiteCore Live Takeoff Sandbox
Open Full SiteCore v0.1 App ↗

Formula: Vg = L × W × T ; Vn = Vg − D ; Vo = Vn × (1 + waste% / 100)

Audited Concrete BOQ Breakdown

Net BOQ Volume (Vn)

3.800 m³

Order (+5% waste)

3.990 m³

Gross Volume: 4.050 m³Imperial: 134.20 ft³

Engine runs purely in TypeScript (`sitecore_v1` IndexedDB) with immutable snapshots.

Workflow · Calculate → Explain → Save to Project → Price → Record Work

All 7 Built-In SiteCore v0.1 Calculators & Golden Verification Checks

sites.google.com/view/sitecore-ak/ ↗
Concrete Volumem³

Slabs/beams/columns minus deductions · Ex: 5×4×0.125m = 2.500 m³

Masonry Wallm³

Bricks & wet mortar minus openings · Ex: 5×3×0.23m = 2.967 m³ (1,558 units)

Wall Plasterm²

1/2-face plaster + cement/sand · Ex: 2 faces @ 12mm = 25.8 m² (0.3096 m³)

Wall Paintm²

N-coat paint area + 10% allowance · Ex: 12.9 m² × 2 ÷ 10 + 10% = 2.838 L

Flooring & Tilesm²

Whole tiles & boxes minus cutouts · Ex: 5×4m (600mm) = 62 tiles, 16 boxes

Steel Weightkg

Circular rebar π/4×d²×7850×L×N · Ex: Ø12mm × 10m × 5 = 44.391 kg

Geometry & Unitsm²/m³

Exact metric-imperial helper · Ex: 12 ft 2 in ↔ 3.7084 m

BOQ + Work Logs₹ / %

INR totals separated from physical units · OVERRUN (>100%) alerts · JSON/CSV

Estimation Aid Disclaimer: Quantities, mortar splits, and rates are geometric planning estimates only — not structural design, mix design, Bar Bending Schedules (BBS), BIS/byelaw compliance, or certified contractor billing. Always verify quantities against approved contract drawings.

Problem & Engineering Context

Site engineers and students rely on fragile spreadsheets that conflate nominal vs. actual brick sizes, sum incompatible physical units (m³, m², kg), skip opening deductions, or overwrite planned baseline quantities when logging daily progress.

Architecture & Key Implementation Details

  • Core workflow (Calculate → Explain → Save to Project → Price → Record Work): saving stores an immutable baseline snapshot in browser IndexedDB (`sitecore_v1`), so later unit-rate edits or YYYY-MM-DD work logs never corrupt planned quantities.
  • Strict unit discipline: physical quantities (m³, m², kg) remain separated; only priced items (INR / ₹) roll up into project cost, accompanied by OVERRUN (>100%) progress indicators and 1-click JSON/CSV backup & validated import.
  • Auditable explanations with exact metric-imperial conversions (1 ft = 0.3048 m, 1 in = 0.0254 m) plus an explicit Estimation Aid Disclaimer: geometric planning estimates only — not certified structural design, mix design, Bar Bending Schedules (BBS), BIS/byelaw compliance, or contractor billing.

Key Deliverables

  • All 7 Built-In Calculators (Concrete, Masonry, Plaster, Paint, Flooring, Steel, Geometry/Units)
  • Instant DEMO-01 Loader (`Studio Residence — DEMO`), Itemized INR Pricing & OVERRUN Alerts
  • Live Static App (/demos/sitecore/) + SiteCore Portal (sites.google.com/view/sitecore-ak/)

Tools & Stack

ViteReact 18TypeScriptIS-Metric FormulasIndexedDB (sitecore_v1)Vitest